What tonnage sizing means at 152 → 114 mm

Carbon steel 45 (AISI 1045), 152 → 114 mm, 6.0 mm wall. The question this page answers is narrow — what tonnage sizing you should specify — and the answer is 566 kN on the die per bite (about 57.7 t), against 1,020 kN for a single full-reduction bite. Narrow questions are the ones that cost money when they are answered by habit.

Tonnage is set by wall and reduction, not by diameter alone. A machine chosen on diameter is a machine that will stall on the first thick-wall job.

The estimate we use

Peak force rises roughly linearly with yield strength, with wall, and with the diameter reduction. For planning we take the estimate from those three and then add a 30 % margin, because the estimate carries about ±20 % against a real trial. 4,851 pieces per die set is the working number here; below 2,426 pieces a year the tooling never pays back.

The margin is not caution for its own sake. It covers the one part number in your range with a thicker wall, and it covers material at the top of its yield band. The 2.2 per cent scrap allowance is not padding — it is the pass count and the material talking.

Where sizing goes wrong

Two mistakes recur: sizing on the average part instead of the worst, and forgetting that a mandrel adds 10–15 %. Both show up as a machine that works perfectly in the sample room and stalls in production. The mill certificate matters more than the grade name: spread inside the standard moves the force by about 61 kN.

The third is temperature. A cold shop in February raises hydraulic oil viscosity and effective tonnage demand; a machine at the edge in July will not make rate in January. At this size the die sees 566 kN per bite, which is why the L-160×600 CNC is the natural home for the job.

The numbers for this combination

Tube outside diameter152 mm
Small-end diameter114 mm
Wall thickness6.0 mm
Cone length250 mm
Reduction on diameter25.0 per cent
Half angle / included angle4.35° / 8.7°
Yield strength used355 MPa
Forming force, single bite1,020 kN
Forming force, per bite at 2 passes566 kN
Passes2 passes
Processcold forming
Cycle time17.9 s
Output per 8 h shift1,319 pieces
Tip wall after forming6.93 mm (+15 per cent)
Springback on tip diameter0.23 mm
Ovality at the tip0.8 per cent
Blank length427 mm
Blank weight9.22 kg
Machine classL-160×600 CNC

Computed for this combination. Confirm the force and the tip wall on a sample before the die is cut.

Wall thickening is not optional and it is not uniform. 6.93 mm at the tip is the thin-wall constant-volume answer; on a real part expect the last few millimetres of cone to run a little heavier because the material has nowhere to go.

Read the table before the prose if you are in a hurry. The table is the part you can defend in a meeting; the prose explains which entries are sensitive to the material certificate and which are not.

How Carbon steel 45 (AISI 1045) behaves at 25.0 per cent reduction

Medium carbon: noticeably stronger, noticeably less forgiving. Springback is 30–40 % higher than mild steel, and the tip crack window narrows because the material has less elongation left before the die touches it.

In practice the first thing to change with Carbon steel 45 (AISI 1045) is not the die but the lubricant film. steel 45 will form on a marginal film for a hundred pieces and then start picking up on the die — the mark appears long before the dimension moves.

Do not skip that step on a fatigue part. A formed cone carries residual stress that is invisible on the drawing and obvious on a bend test after six months in service.

Extra-large section: 152 → 114 mm

Extra-large cones are almost always hot formed or formed in two stages. The wall is thick enough that cold flow becomes unpredictable and the die sees loads that shorten its life fast.

The 427 mm blank is heavy enough — 9.22 kg — that manual loading sets the pace before the forming stroke does. That is why the cycle sits at 17.9 s rather than the 14.0 s the stroke alone would allow.

The next size up shares the same machine but not the same die, and the changeover is 95 minutes. Plan families of parts around that number rather than around the cycle time.

Cost per 1,000 pieces

Metal in the blank9.22 kg, 10.147 USD
Machine time17.9 s, 0.273 USD
Die cost, one set6,844 USD
Die life4,851 pieces
Scrap allowance2.2 per cent
Cost per piece12.10 USD
Cost per 1,00012,098 USD

Die cost is 1.411 USD per piece here — small enough to ignore on a long run and large enough to matter on a short one. The break-even is around 7070 pieces.

What to put on the drawing

Say what happens after forming: machined, welded, coated, or used as formed. The allowance, the stress relief and the surface spec all follow from that one line.

Add the as-formed wall at the tip as a reference dimension with a minimum. It is the dimension that decides whether the mating bore cleans up, and it is the one most often left off.

Send the drawing as a PDF with the dimensions readable at 100 per cent. Half the quotation delays we see come from a photo of a printout, not from a hard part.

Frequently asked questions

Is a bigger press always safer?

No. An oversized press with a small die gives poor control at low load and costs more in energy. Size for the worst part plus margin, not for the catalogue.

Does tonnage change with taper length?

Yes, longer tapers need more stroke and slightly more total work, though peak force is set mainly by wall and reduction.

How do I verify the estimate?

Form the worst part with a pressure gauge on the main cylinder and record peak. That one number sizes every future job on that machine.

Is steel 45 suitable for a part that will be welded after forming?

It welds, but the formed tip is work-hardened and the weld pool will dilute that. For a structural weld, stress relieve at 600 °C first, or move the weld away from the cone.

Would a smaller machine do this job?

Not at 566 kN per bite with a 152 mm tube to guide. The L-160×600 CNC is the smallest class that holds the die squarely at this diameter; a lighter frame deflects and the ovality shows up before the force limit does.

Talk to an engineer on WhatsApp

Send your tube drawing, material and target output. We will reply with a machine configuration, a measured sample plan and a factory quotation. WhatsApp +86 183 0020 2909 or email info@jixin.online.