What cycle time planning means at 60 → 38 mm
For Carbon steel 45 (AISI 1045) tube at 60 → 38 mm with a 2.5 mm wall, cycle time planning comes down to 12.0 s per piece, which is 1,968 pieces in an eight-hour shift at 82 per cent utilisation. That single line is the answer; the rest of this page is the arithmetic behind it, so you can check the figure against your own drawing instead of taking it on trust.
A cycle time is a promise about capacity. Quoting the fastest stroke instead of the average cycle is how a shift plan fails in the second week.
What the cycle is made of
Load, clamp, approach, form, dwell, retract, unload, transfer. On a medium part the forming segment is under half the cycle; the rest is motion and handling. That is why automation buys more than a faster press. The 2.2 per cent scrap allowance is not padding — it is the pass count and the material talking.
Measure over 100 consecutive parts, not on a video of the best one. The average includes the slow parts, and the slow parts are what your customer experiences. The mill certificate matters more than the grade name: spread inside the standard moves the force by about 12 kN.
Turning it into a shift
Parts per shift = shift seconds × utilisation ÷ cycle. At 85 % utilisation on a 7.5-hour shift you have 22 950 seconds of real production. Everything else — die changes, breaks, waiting for tube — comes out of the 15 %. At this size the die sees 112 kN per bite, which is why the L-120×400 F is the natural home for the job.
If a supplier quotes a cycle without a utilisation figure, the number is not usable for planning. Ask for both, and ask how many parts were measured. Running 2 passes puts the cycle at 12.0 s and the shift output near 1,968 pieces.
The numbers for this combination
| Tube outside diameter | 60 mm |
| Small-end diameter | 38 mm |
| Wall thickness | 2.5 mm |
| Cone length | 95 mm |
| Reduction on diameter | 36.7 per cent |
| Half angle / included angle | 6.60° / 13.2° |
| Yield strength used | 355 MPa |
| Forming force, single bite | 201 kN |
| Forming force, per bite at 2 passes | 112 kN |
| Passes | 2 passes |
| Process | cold forming |
| Cycle time | 12.0 s |
| Output per 8 h shift | 1,968 pieces |
| Tip wall after forming | 3.14 mm (+26 per cent) |
| Springback on tip diameter | 0.083 mm |
| Ovality at the tip | 1.3 per cent |
| Blank length | 171 mm |
| Blank weight | 0.606 kg |
| Machine class | L-120×400 F |
Computed for this combination. Confirm the force and the tip wall on a sample before the die is cut.
The blank length assumes you grip 66 mm of straight tube in the collet and trim 10 mm after forming. If your chuck is longer, add it to 171 mm — the cone itself does not change, only the material you pay for.
Read the table before the prose if you are in a hurry. The table is the part you can defend in a meeting; the prose explains which entries are sensitive to the material certificate and which are not.
How Carbon steel 45 (AISI 1045) behaves at 36.7 per cent reduction
Medium carbon: noticeably stronger, noticeably less forgiving. Springback is 30–40 % higher than mild steel, and the tip crack window narrows because the material has less elongation left before the die touches it.
In practice the first thing to change with Carbon steel 45 (AISI 1045) is not the die but the lubricant film. steel 45 will form on a marginal film for a hundred pieces and then start picking up on the die — the mark appears long before the dimension moves.
At 36.7 per cent reduction the work-hardening from forming is worth roughly 78 MPa of extra yield at the tip. If your next operation is machining, that is helpful; if it is another forming pass, budget for it.
Medium section: 60 → 38 mm
The 60 to 38 pair is the workhorse of the trade: fork blanks, furniture legs, pole sections. Tonnage is moderate and almost every machine size can do it, so the decision usually turns on cycle time and die life.
The 171 mm blank is heavy enough — 0.606 kg — that manual loading sets the pace before the forming stroke does. That is why the cycle sits at 12.0 s rather than the 9.4 s the stroke alone would allow.
Machine class for 60 mm is the L-120×400 F. Going one class up buys stiffness you will not use at this diameter and costs floor space you will miss.
Cost per 1,000 pieces
| Metal in the blank | 0.606 kg, 0.667 USD |
| Machine time | 12.0 s, 0.080 USD |
| Die cost, one set | 1,652 USD |
| Die life | 27,722 pieces |
| Scrap allowance | 2.2 per cent |
| Cost per piece | 0.82 USD |
| Cost per 1,000 | 825 USD |
The 0.82 USD figure excludes finishing, coating and packing. It is the formed part at the machine, which is the only number that lets you compare two processes fairly.
What to put on the drawing
Say what happens after forming: machined, welded, coated, or used as formed. The allowance, the stress relief and the surface spec all follow from that one line.
Add the as-formed wall at the tip as a reference dimension with a minimum. It is the dimension that decides whether the mating bore cleans up, and it is the one most often left off.
If you cannot state the cone length because the part is defined by a mating component, send the mating component instead. We will derive the cone and tell you what the resulting angle is before quoting.
Frequently asked questions
Does dwell count in the cycle?
Yes, and it should. Dwell is what stops the cone springing back; cutting it to shorten the cycle moves the problem to inspection.
Why is the first hour slower?
Cold hydraulics, cold die and an operator settling in. Plan the day so the first hour is setup, not production.
Can cycle time be improved later?
Usually by 10–20 % through feed and handling changes, rarely through the press. Budget for the press you need, not the one you hope to optimise into.
Is steel 45 suitable for a part that will be welded after forming?
It welds, but the formed tip is work-hardened and the weld pool will dilute that. For a structural weld, stress relieve at 600 °C first, or move the weld away from the cone.
Would a smaller machine do this job?
Not at 112 kN per bite with a 60 mm tube to guide. The L-120×400 F is the smallest class that holds the die squarely at this diameter; a lighter frame deflects and the ovality shows up before the force limit does.