The three terms we quote

EXW Dongguan is our base price: the machine is ready at our factory, packed in a plywood case. You appoint the forwarder, and from our gate the cost and the risk are yours.

FOB Shenzhen or Guangzhou means we deliver to the port, clear export in China and load under the shipping line’s terms. This is usually the simplest upgrade from EXW and adds little to the price.

CIF your port means we also pay the ocean freight and insurance. We quote it when you ask, but we show the freight as a separate line, because rates move every two weeks and we do not want a stale number buried in a machine price.

What is inside the EXW price

Machine with the control cabinet, one die set machined to your drawing, first-year spare parts kit, plywood case with moisture barrier and internal bracing for sea transport, plus the full document pack.

Outside the EXW price: loading, inland transport to the port, export declaration, ocean freight, insurance, import duty and destination charges. We can arrange loading and inland haulage at cost, shown as a separate line on the invoice.

Transit time by destination

St Petersburg, by sea from Shenzhen or Guangzhou: 30–40 days plus 7–10 days for booking and loading. By rail through Zabaikalsk: 25–30 days.

Novosibirsk, by rail through Dostyk or Zabaikalsk: 18–28 days depending on border congestion. Faster than sea plus domestic rail, and usually cheaper for a 3–5 tonne machine.

Istanbul (Ambarlı) or Mersin: 22–32 days by sea. Izmir is served via Istanbul or Mersin with a feeder.

Alexandria or Port Said: 22–30 days by sea, one 20-foot container for a machine of this size.

Antwerp: 32–40 days by sea. Rotterdam is the usual alternative if your forwarder prefers it.

Documents that travel with the machine

Commercial invoice, packing list, sales contract, specification sheet, certificate of origin, machine passport, electrical and hydraulic diagrams, spare parts list with part numbers, and operator instructions.

For Russia and the EAEU, the importer files the conformity declaration; we supply the technical data, drawings and sample documents the certification body asks for. For the EU, CE marking and the declaration of conformity sit with the importer placing the machine on the market — we provide the technical file and test records, not a certificate we do not hold.

Payment, lead time and inspection

Standard terms: 30 percent deposit with the order, 70 percent before shipment. Lead time is 25–35 days for a standard model and 40–55 days for a machine built to a special drawing.

Inspection is welcome at our Dongguan plant. If a visa is impractical, we run a live video inspection: assembly, a run on your tube, and diameter and wall thickness measured at three points while you watch.

Frequently asked questions

Why do you quote EXW instead of CIF?

Because freight changes every two weeks and we would rather not hide a moving number inside the machine price. EXW keeps the comparison between suppliers honest; we quote CIF on request with the freight on its own line.

Can you load the machine onto my forwarder’s truck?

Yes. Loading at our gate is at cost, usually a small fixed fee, and we photograph the loading and the case seals for your records.

Do you supply a CE certificate?

No, and no honest Chinese manufacturer can. CE marking is the importer’s declaration. We supply the technical file, electrical schematics and test records that your notified body or consultant needs.

What voltage do you build for each market?

380 V 50 Hz for Russia, Turkey and Egypt; 400 V 50 Hz for Belgium and the EU. Tell us the site voltage and we build to it rather than shipping a transformer.

Ask on WhatsApp

Tell us the destination port and the tube you need to form. We will reply with the EXW price, the lead time and a freight indication for your route.

Ask on WhatsApp