What a 110 → 69 mm taper asks of the die

This geometry removes 37.5 per cent from the outside diameter over a 250 mm cone. The included cone angle is 9.4°, and at a 2.0 mm starting wall the material has to flow inward rather than be cut away.

The raw estimate is 299 kN for one bite. Split into 2 passes it becomes about 166 kN per bite, and the difference is the whole reason to plan the passes before choosing a press.

Tip wall and springback on this part

Constant volume puts the wall at the small end near 2.53 mm, 26 per cent heavier than the 2.0 mm blank. If the mating bore was dimensioned from the starting wall, it will not assemble. Add the as-formed tip wall to the drawing as a reference dimension with a minimum.

The tip comes back 0.13 mm larger than the die once the load is released. Ovality around 1.4 per cent is normal and is held down by a full-length guide bushing.

How steel 45 behaves at 110 mm outside diameter

Medium carbon: noticeably stronger, noticeably less forgiving. Springback is 30–40 % higher than mild steel, and the tip crack window narrows because the material has less elongation left before the die touches it.

Ovality is measured as the difference between the largest and smallest diameter at the same section. Above about 1 % of OD, a tapered end stops fitting the thing it was made for.

At 355 MPa yield with medium ductility, this grade needs 2 passes on this geometry. The die is expected to last 4,851 pieces before the first re-polish, and the stress-relief practice is: Normalise after forming whenever the part sees bending or cyclic load.

Typical applications are shafts, spindles, load-bearing pins. If your part sits outside that list, the forming numbers still apply but the corrosion and fatigue assumptions may not.

Cycle, tooling and piece cost

Cycle time is about 18.2 seconds from tube in to tube out, which is roughly 1,297 pieces in an eight-hour shift at 82 per cent utilisation. The die is expected to make 4,851 pieces before the first re-polish.

Raw material is 56 per cent of the 4.01 USD piece cost here. That ratio is why the L-120×400 F and not a heavier frame is the economic choice at this diameter.

How to quote this geometry

Send the two diameters, the cone length, the wall and the grade. State what you need on ovality control before asking for a price, because that decision drives the tooling.

For Carbon steel 45 (AISI 1045) the decision that moves the number most is ovality control. Say what you need there before asking for a price.

Frequently asked questions

What machine class forms a 110 → 69 mm tube?

The L-120×400 F. Forming force is about 166 kN per bite with 2 passes, so a smaller frame will deflect before it stalls.

How much thicker is the tip?

From 2.0 mm to about 2.53 mm, an increase of 26 per cent. Machine the bore after forming if the fit is tight.

What should I put on the drawing?

The two diameters, cone length, wall, grade and the as-formed tip wall. Add springback compensation of about 0.13 mm on the die.

Talk to an engineer on WhatsApp

Send your tube drawing, material and target output. We will reply with a machine configuration, a measured sample plan and a factory quotation. WhatsApp +86 183 0020 2909 or email info@jixin.online.

Chat on WhatsApp