What a 60 → 38 mm taper asks of the die
This geometry removes 36.7 per cent from the outside diameter over a 190 mm cone. The included cone angle is 6.6°, and at a 2.5 mm starting wall the material has to flow inward rather than be cut away.
A single full-reduction bite would need about 201 kN. The working schedule is 2 passes, which puts roughly 112 kN on the die each bite. That is the figure to size the machine and the tooling with.
Tip wall and springback on this part
Constant volume puts the wall at the small end near 3.14 mm, 26 per cent heavier than the 2.5 mm blank. If the mating bore was dimensioned from the starting wall, it will not assemble. Add the as-formed tip wall to the drawing as a reference dimension with a minimum.
Plan 0.083 mm of springback on the tip and roughly 1.3 per cent ovality. Both are cut into the tool geometry, not chased with the stroke setting after the parts drift.
How steel 45 behaves at 60 mm outside diameter
Medium carbon: noticeably stronger, noticeably less forgiving. Springback is 30–40 % higher than mild steel, and the tip crack window narrows because the material has less elongation left before the die touches it.
Changeover time decides the minimum batch size that is worth running. Below that number, the honest answer is to quote higher or decline.
At 355 MPa yield with medium ductility, this grade needs 2 passes on this geometry. The die is expected to last 8,317 pieces before the first re-polish, and the stress-relief practice is: Normalise after forming whenever the part sees bending or cyclic load.
Typical applications are shafts, spindles, load-bearing pins. If your part sits outside that list, the forming numbers still apply but the corrosion and fatigue assumptions may not.
Cycle, tooling and piece cost
Cycle time is about 14.2 seconds from tube in to tube out, which is roughly 1,663 pieces in an eight-hour shift at 82 per cent utilisation. The die is expected to make 8,317 pieces before the first re-polish.
The piece cost lands near 1.78 USD with 58 per cent in the blank. Die amortisation is spread over 8,317 pieces before the first re-polish.
How to quote this geometry
Give us the five numbers and the grade, then ask for the first article as a named milestone. The 1.78 USD piece cost on this page is the planning baseline for it.
For Carbon steel 45 (AISI 1045) the decision that moves the number most is changeover economics. Say what you need there before asking for a price.
Frequently asked questions
What machine class forms a 60 → 38 mm tube?
The L-120×400 F. Forming force is about 112 kN per bite with 2 passes, so a smaller frame will deflect before it stalls.
How much thicker is the tip?
From 2.5 mm to about 3.14 mm, an increase of 26 per cent. Machine the bore after forming if the fit is tight.
What should I put on the drawing?
The two diameters, cone length, wall, grade and the as-formed tip wall. Add springback compensation of about 0.083 mm on the die.
Talk to an engineer on WhatsApp
Send your tube drawing, material and target output. We will reply with a machine configuration, a measured sample plan and a factory quotation. WhatsApp +86 183 0020 2909 or email info@jixin.online.
Chat on WhatsApp
