What a 80 → 50 mm taper asks of the die
This geometry removes 37.5 per cent from the outside diameter over a 250 mm cone. The included cone angle is 6.9°, and at a 2.5 mm starting wall the material has to flow inward rather than be cut away.
A single full-reduction bite would need about 333 kN. The working schedule is 2 passes, which puts roughly 185 kN on the die each bite. That is the figure to size the machine and the tooling with.
Tip wall and springback on this part
Constant volume puts the wall at the small end near 3.16 mm, 26 per cent heavier than the 2.5 mm blank. If the mating bore was dimensioned from the starting wall, it will not assemble. Add the as-formed tip wall to the drawing as a reference dimension with a minimum.
Plan 0.12 mm of springback on the tip and roughly 1.3 per cent ovality. Both are cut into the tool geometry, not chased with the stroke setting after the parts drift.
How 4130 chromoly behaves at 80 mm outside diameter
The fork-shaft standard. Higher yield means higher tonnage and stronger springback, and it work-hardens quickly, so a second pass on an already formed cone is not an option.
A cycle time is a promise about capacity. Quoting the fastest stroke instead of the average cycle is how a shift plan fails in the second week.
At 435 MPa yield with medium ductility, this grade needs 2 passes on this geometry. The die is expected to last 3,991 pieces before the first re-polish, and the stress-relief practice is: Normalise or anneal before forming if the tube arrives cold-drawn; stress relief after forming is normal practice.
Typical applications are e-bike and motorcycle fork shafts, suspension tubes, motorsport parts. If your part sits outside that list, the forming numbers still apply but the corrosion and fatigue assumptions may not.
Cycle, tooling and piece cost
Cycle time is about 17.3 seconds from tube in to tube out, which is roughly 1,365 pieces in an eight-hour shift at 82 per cent utilisation. The die is expected to make 3,991 pieces before the first re-polish.
The piece cost lands near 4.92 USD with 54 per cent in the blank. Die amortisation is spread over 3,991 pieces before the first re-polish.
How to quote this geometry
Give us the five numbers and the grade, then ask for the first article as a named milestone. The 4.92 USD piece cost on this page is the planning baseline for it.
For Chromoly 4130 (30KhGSA) the decision that moves the number most is cycle time planning. Say what you need there before asking for a price.
Frequently asked questions
What machine class forms a 80 → 50 mm tube?
The L-120×400 F. Forming force is about 185 kN per bite with 2 passes, so a smaller frame will deflect before it stalls.
How much thicker is the tip?
From 2.5 mm to about 3.16 mm, an increase of 26 per cent. Machine the bore after forming if the fit is tight.
What should I put on the drawing?
The two diameters, cone length, wall, grade and the as-formed tip wall. Add springback compensation of about 0.12 mm on the die.
Talk to an engineer on WhatsApp
Send your tube drawing, material and target output. We will reply with a machine configuration, a measured sample plan and a factory quotation. WhatsApp +86 183 0020 2909 or email info@jixin.online.
Chat on WhatsApp