Shelving upright: 38 to 32 mm taper, 1.5 mm wall
A Shelving upright is formed from a 38 mm tube down to 32 mm over a 75 mm taper, on 1.5 mm wall in Mild steel Q235 / 1018. Below are the numbers this size actually produces, the machine it runs on, and what to check on the first article.
| Part | Shelving upright |
|---|---|
| Material | Mild steel Q235 / 1018 |
| Tube OD | Ø38 mm |
| Finished tip | Ø32 mm |
| Wall | 1.5 mm |
| Taper length | 75 mm |
| Diameter reduction | 15.8% |
| Forming force | 8 t |
| Wall at tip | 1.6 mm |
| Blank consumed | 69.7 mm |
| Cycle time | 8.6 s |
| Die half-angle | 16.6° from axis |
| Machine | Ø50×400 |
How this part is formed
Shelving uprights taper at the top so a cap or a cross brace seats, and the flatness of the taper matters because the beam hook bears on it.
The 38 mm tube is pushed into a 16.6° die over a 75 mm stroke. The diameter falls to 32 mm and the wall goes from 1.5 mm to about 1.6 mm, because the metal has nowhere to go but thicker. Estimated force is 8 t, which is why this size runs on the Ø50×400.
One piece takes about 8.6 s of machine time, so roughly 340 pieces an hour before loading and unloading are counted. The blank has to be 69.7 mm longer than the finished part because the taper pulls material in from the shank.
Tolerance and first-article checks
Measure three things on the first piece: tip diameter to ±0.15 mm, wall at the tip to ±0.15 mm, and taper length to ±0.5 mm. Ovality at the tip should stay inside 0.10 mm for a nesting part and 0.20 mm for a welded one. Send a drawing with the tube OD, the finished tip, the taper length and the material grade and you get a configuration and a price within 24 hours.
Can a Shelving upright at this size be formed in one pass?
Yes. 8 t of estimated force is inside the capacity of the Ø50×400, and the 75 mm taper is one die stroke. Two passes are only needed above 160 t.
What is the wall thickness at the tip?
About 1.6 mm, against 1.5 mm in the straight shank. The wall thickens because the diameter reduces by 15.8% and the material has to go somewhere.
How many pieces per hour?
Roughly 340 at a 8.6 s cycle, before handling. Add 2 to 4 s per piece for manual load and unload.
What blank length do I order?
The finished part plus 69.7 mm of allowance. Cut the blank to ±0.5 mm on length; a short blank starves the taper and a long one leaves a step at the shank.